1, Report:
#70375
Posted Date:
Oct 29 2003
County Concrete And Construction Formerly County Concrete, Terri Marozzi, Paul Fletcher, Vinod Mehta ripoff Failed ALL Inspections, Refuse to Correct Problems and Damage, Has NO Workers Comp Ins, Left My Driveway Half Done, Won't Cooperate with City Inspectors Davie Florida
I contracted with County Contraction and Construction on June 18, 2003, to remove my old asphalt driveway, and replace it with concrete.
These pictures speak for themselves...
Paul Fletcher signed all the paperwork, and the cost was to be $3,187.00. Half of this amount was re...
Entity
Categories: Building Services
2, Report:
#1795
Posted Date:
Mar 28 2000
RE: COUNTY CONCRETE
ON FEB 25, 2000 MY HUSBAND PAID $840.00 CASH TO A PAUL E FLECHER, THE PRESIDENT OF COUNTY CONCRETE. THIS WAS A DEPOSIT ON THE INSTALLATION OF CONCRETE AROUND THE POOL AREA. THE TOTAL COST WAS $1659.00. MY HUSBAND TRIED TO GET IN TOUCH WITH PAUL FLETCHER ON AT LEAST EIGHT TRIES OVER...
Entity
Categories: Landscape Companies